The collectionVillas and homesCommercialWhere we workPricingNotesKit builderWrite to the studioEspañolPortuguês

Hotels, clubs, clinics, developers

Wellness corners drawn for a rota: pools, saunas and paperwork

A recovery corner in a hotel, padel club, gym or clinic is judged by three things: whether guests use it, whether it stays clean on a rota and whether the engineer signs it off. We draw for all three: shared cold pools on a documented plant, glass saunas for eight to twelve, and the schedules your architect asks for.

Sections on this page
  1. What a commercial brief changes
  2. What your architect and engineer will ask for
  3. How we price a commercial project
  4. Six things a commercial brief should state

What a commercial brief changes

A private homeA hotel, club or clinic
Who uses ita householdguests, members or patients, in numbers that set the rota
Pool typeplunge pool, timber tub or ice bathbuilt-in plunge pool only
Powersingle-phase is usualthree-phase for cabins of eight seats and up
Cleaningthe ownera written rota, documented disinfection, a plan for water changes
Paperworka layout and a manuallayouts, power and drainage loads, declarations of conformity, handover manual
Supervisionnoneglass fronts so staff can see in, notices at the pool

What your architect and engineer will ask for

  • Plans and sections of the cabin, the pools and the plant space, with weights and falls.
  • Electrical loads by item, and the phase arrangement.
  • Drainage and ventilation paths, including the air path of every chiller.
  • The declaration of conformity for each electrical item, and the manuals that go with the handover.
  • A cleaning and water-care routine your staff can follow without us in the room. Hygiene for commercial plunge pools is the note to start with.

We work next to your architect and contractor, not instead of them: you stay the main contractor, we supply the circuit and its drawings, and we build to the dimensions your architect issues.

How we price a commercial project

A commercial range is built from the same lines as a home one, with three additions: the plant room and its fit-out, the documents and the commissioning. We show each line in the layout, so your quantity surveyor can compare it with the other trades. Payment is 40 / 40 / 20, and the final instalment is released by a signed temperature test, not by a date.

Six things a commercial brief should state

  1. The number of guests, members or patients per day, and the peak hour.
  2. The opening date and any works you cannot do in season.
  3. Who owns the key, the rota and the log sheet.
  4. The electrical supply available, and the phase arrangement.
  5. The authority or insurer whose rules apply to a pool used by the public or guests.
  6. The architect and the services engineer, so that we draw onto their sheets.
A note on the word recovery

It names a kind of room, with a cabin and cold pools. It says nothing about what the room does for anyone, and we make no health claim for it. The same goes for the word longevity on the clinic page.

Can you work from our architect's drawings?

Yes. Send the plans and sections; we return the circuit drawn onto them, with the plant space marked and the loads listed.

What is the largest cabin you build?

Twelve seats, 4.0 × 2.8 m, with an 18 kW Harvia heater on a three-phase supply. Indicative range €27,000–37,500. For more seats we draw two cabins.

Who maintains it after handover?

Your staff keep it clean and checked on the rota we write with you. We cover the equipment for two years, with assisted service visits during the first year.

Brief us

Send the brief, the plan and the opening date; we reply with a layout and a schedule

Free 3D layout in up to five working days.

WhatsAppPrice list